|
Select a page:
|
Records per Page
|
Page 1 of 3
|
|
Link | Details | Date | Miles |
| Released from English Electric Vulcan Foundry - Works Number EE/VF3386/D852 1963 As D6908 |
20-11-63
| |
| First Allocated to Landore |
20-11-63
| |
| 1Z32 Llandilo - Cardiff rugex |
21-03-64
| |
| Left Crewe Works having had it's boiler removed and ballast weight fitted |
10-04-65
| |
| Stabled on Margam |
08-08-65
| |
| 9B05 Coal Working to Bristol through Neath |
09-08-65
| |
| Transferred to Cardiff Canton |
??-03-67
| |
| Painted in Green Livery with full yellow ends |
??-11-68
| |
| Observed at Radyr having worked a permanent way train |
20-04-69
| |
| Stabled on Radyr |
25-05-69
| |
| Passenger service between Cardiff - Barry |
12-07-69
| |
| Stabled on Radyr |
24-07-69
| |
| Observed at Cardiff Station |
31-07-69
| |
| Fitted with Dual (BR & WR) Automatic Warning System (DAWS) |
??-09-69
| |
| Observed at Filton paired with 6907 |
05-05-71
| |
| Observed at Cardiff Stn |
05-01-72
| |
| Stabled on Cardiff Canton 86A |
04-06-72
| |
| Transferred to Landore |
??-07-72
| |
| Stabled on Cardiff Canton depot |
31-07-72
| |
| Observed at Cardiff |
30-04-73
| |
| Observed at Cardiff |
10-05-73
| |
| Observed at Gloucester. |
12-05-73
| |
| On Shed at York Depot |
02-06-73
| |
| Observed at Landore maintenance shed |
04-07-73
| |
| Observed at Cardiff Central |
21-08-73
| |
| Observed at Margam depot |
26-09-73
| |
| Observed at Cardiff Central |
10-11-73
| |
| Renumbered to 37208 |
??-02-74
| |
| Observed at Margam |
03-04-74
| |
| Observed at Landore Engine Shed Swansea |
06-04-74
| |
| Observed at Ebbw Junction |
22-08-74
| |
| Observed at Ebbw Junction |
21-09-74
| |
| Observed at Cardiff Central |
04-01-75
| |
| Observed at Margam Engine Shed Port Talbot |
01-04-75
| |
| Observed at Bristol Temple Meads Station |
03-04-75
| |
| Dragged failed 47246 into Birmingham NS (with 37307) on the 07.40 Penzance - Liverpool |
18-04-75
| |
| Observed at Cardiff Central |
09-06-75
| |
| Observed at Margam |
21-06-75
| |
| Observed at Newport |
21-06-75
| |
| Observed at Cardiff Central |
03-09-75
| |
| 4V10 through Filton With 37296 (37423) |
12-10-75
| |
| Observed at Newport |
27-03-76
| |
| Observed at Landore |
09-05-76
| |
| Observed light engine through Pilning heading East |
21-07-76
| |
| Observed at Cardiff |
03-08-76
| |
| Worked Coal Block Train East through Pilning With 45028 |
20-08-76
| |
| Observed light engine through Pilning heading East |
20-08-76
| |
| Observed at Severn Tunnel Junction Engine Shed |
21-08-76
| |
| Observed at Cardiff |
11-09-76
| |
| Observed at Ebbw Junction |
02-10-76
| |
| Worked Severn Tunnel Junction - Bedwas |
28-04-77
| |
| Worked Bedwas - Severn Tunnel Junction |
28-04-77
| |
| Worked Severn Tunnel Junction - Ebbw Junction light engine |
28-04-77
| |
| GW ATC removed |
??-05-77
| |
| Observed at Landore |
22-05-77
| |
| 2C37 1705 Newport - Swansea |
01-06-77
| 57.29 |
| Stabled on Canton |
05-06-77
| |
| Stabled on Ebbw jn |
26-06-77
| |
| Observed at Swindon |
04-08-77
| |
| 1S19 2110 Bristol TM - Glasgow C between Bromsgrove - Blackwell with 37251 Banking 46001 |
05-08-77
| 2.22 |
| Stabled on Cardiff Canton Depot |
21-01-78
| |
| Observed at Landore |
22-01-78
| |
| Observed at Doncaster Works Open Day |
17-06-78
| |
| Stabled on Doncaster Works |
18-06-78
| |
| Observed at Doncaster Station |
23-06-78
| |
| 2C50 1705 Newport - Swansea |
06-07-78
| 57.29 |
| Observed at Newport |
24-07-78
| |
| Observed at Margam Engine Shed Port Talbot |
21-10-78
| |
| Observed at Ebbw Junction |
02-12-78
| |
| Observed at Willesden Junction |
15-12-78
| |
| Worked 0E04 1010 Ebbw Jct - Dock St |
11-05-79
| |
| Worked 9E04 1111 Dock St - Alexandra Dock Junction |
11-05-79
| |
| Worked 9E04 1220 Alexandra Dock Junction - Severn Tunnel Junction |
11-05-79
| |
| Worked 0E04 1355 Severn Tunnel Junction - Ebbw Junction |
11-05-79
| |
| Worked 0615 Alexandra Dock Junction - Uskmouth |
17-05-79
| |
| Worked 1029 Uskmouth - Alexandra Dock Junction |
17-05-79
| |
| Worked 6A81 1310 Ebbw Jucntion - Rose Hayworth |
16-07-79
| |
| Worked 6A81 1600 Rose Hayworth - Severn Tunnel Junction |
16-07-79
| |
| 1E04 0730 Birmingham NS - Newcastle |
01-08-79
| 208.51 |
| 1V96 1338 Newcastle - Swansea |
01-08-79
| 208.51 |
| 1M60 1515 Plymouth - Manchester Between Gloucester - Birmingham NS |
02-08-79
| 52.00 |
| 1E04 0730 Birmingham NS - Newcastle |
03-08-79
| 208.51 |
| 1V96 1335 Newcastle - Swansea |
03-08-79
| |
| Transferred to Bristol Bath Road |
05-08-79
| |
| 1Z16 0730 Exeter - Pwllhelli F&W Cambrian Coast Between Exeter - Birmingham NS With 37204 (37378) |
26-08-79
| 163.45 |
| 1Z16 0730 Exeter - Pwllhelli F&W Cambrian Coast Between Birmingham NS - Exeter With 37204 (37378) |
26-08-79
| 163.45 |
| 1M60 1515 Plymouth - Manchester P Between Bromsgrove - Blackwell Banking 25211 With 37205 (37688) |
14-09-79
| 2.22 |
| 1S19 2130 Bristol TM - Glasgow C Between Bromsgrove - Blackwell Wiyth 37205 |
22-09-79
| 2.22 |
| 1M60 1515 Plymouth - Manchester P Between Bromsgrove - Blackwell With 37205 Banking 31304 |
25-09-79
| 2.22 |
| 1M60 1515 Plymouth - Manchester P Lickey Bankers With 37205 (37688) |
28-09-79
| 2.22 |
| 1B86 2305 Paddington - Plymouth Between Chippenham - Bristol TM 09/12 dep. 50042 failed |
10-12-79
| 24.42 |
| 1S19 2130 Bristol TM - Glasgow C Between Bromsgrove - Blackwell Banking 50039 With 37203 |
28-12-79
| 2.22 |
| Observed at Reading |
21-05-80
| |
| 1E38 1938 Bristol - Newcastle Between Bristol - Gloucester With 37205 (37688) |
06-06-80
| 37.10 |
| 1V99 1735 Leeds - Bristol Between Gloucester - Bristol With 37205 (37688) |
06-06-80
| 37.10 |
| 1M43 0655 Gloucester - Birmingham NS Banked failed 37180 up Lickey With 37232 |
30-10-80
| 2.22 |
| 1V90 1322 Liverpool - Plymouth - between Birmingham? - Gloucester With 37204 (37378) |
15-11-80
| |
| Dragged HST on up Cornish Riviera Between Plymouth - Exeter SD |
09-04-81
| 49.95 |
| 1V94 1432 Leeds - Plymouth Between Gloucester - Bristol TM With 37159 |
11-04-81
| 37.10 |
| 1V32 1610 Portsmouth H - Cardiff Between Bristol TM - Cardiff |
14-07-81
| 38.06 |